Turnover / Housekeeping

Mission Control
As of Wed 09-02 14:00 CT Language: Spanish Spec mode on

Which unit next, by what time, and is anything blocking it?

Turn list, by check-in time / Lista de limpieza, por hora de entrada

Do not mark a unit ready if an issue remains unresolved. Readiness is binary and attested. / No marques una unidad como lista si queda un problema sin resolver. Estar lista es binario y se firma.

C3 Pine
Blocked / Bloqueada 16:00 CT · 05:00 PHT (tomorrow) in 2h
Reason / Motivo: shower drains slowly, before check-in on Friday at 16:00.
Erin
contract: Unit {code,state,nextCheckIn,owner} phase 8 gate: an unresolved issue blocks READY
Source: slack #turnover · Hydrated Wed 09-02 14:00 CT · Gaps: 5 (tap)

Known gaps in this data, shown rather than hidden.

Unit inventory PARTIAL

  • 12 vs 13 units
  • Code-to-name map unconfirmed
  • Per-unit sleeps, pet designation, All-Inclusive eligibility

Owner of the content: Jasmine
How to close it: A one-page table in Drive 05_H4 Dropbox for Cressio / Selah Place, or comments on Requests - Selah Place.

Slack ingest PARTIAL

  • Real export or live capture on the partner-pm token
  • Channel allowlist armed

Owner of the content: Joshua
How to close it: Copy the export zip to data/selah/slack-export or extend partner-pm to full-channel capture.

Per-unit checklist, from the SOP / Lista por unidad, del SOP

C3 · Pine

0. Before you begin / Antes de empezar

1. General reset, all spaces / Reinicio general, todos los espacios

2. Bedrooms / Dormitorios

3. Bathrooms / Baños

4. Kitchen or kitchenette / Cocina o cocineta

5. Living and common areas / Sala y áreas comunes

6. Outdoor and entry / Exterior y entrada

7. Above and beyond details / Detalles que suman

8. Issue reporting, do not skip / Reporte de problemas, no lo saltes

9. Communication and sign-off / Comunicación y firma

10. Final sign-off / Firma final

67 items across 11 phases; phases 4 and 6 are conditional on unit attributes
Source: turnover SOP 2026-07-10 · Hydrated 2026-07-10 · Gaps: 3 (tap)

Known gaps in this data, shown rather than hidden.

Check-in policy PARTIAL

  • Written policy
  • The three 'Selah standard' reference cards (thermostat, bed, layout)
  • Parking rule (1 vs 2 vehicles)

Owner of the content: Jasmine / Kelly
How to close it: Photos and a short note in the Drive folder.

Issue report / Reporte de problemas

Maintenance / Mantenimiento
Photo pending capture / Foto pendiente
Broken or missing / Roto o faltante
Photo pending capture / Foto pendiente
Stain or damage / Mancha o daño
Photo pending capture / Foto pendiente
Supply shortage / Falta de insumos
Photo pending capture / Foto pendiente
Lost and found / Objetos perdidos
Photo pending capture / Foto pendiente

No open work order. / Ninguna orden de trabajo abierta.

Source: turnover SOP phase 8 · Hydrated 2026-07-10 · Gaps: 2 (tap)

Known gaps in this data, shown rather than hidden.

Slack ingest PARTIAL

  • Real export or live capture on the partner-pm token
  • Channel allowlist armed

Owner of the content: Joshua
How to close it: Copy the export zip to data/selah/slack-export or extend partner-pm to full-channel capture.

Sign-off / Firma

Initials / Iniciales: ________Date / Fecha: ________Unit / Unidad: ________
Read only in v1. The attestation still happens on the printed sheet. / Solo lectura en la v1. La firma sigue en la hoja impresa.

Your work prepares a place of rest. What you do matters, even when unseen.

Tu trabajo prepara un lugar de descanso. Lo que haces importa, aunque nadie lo vea.

v1 renders the attestation read-only; the write becomes the first action in P5
Source: turnover SOP closing reminder · Hydrated 2026-07-10 · Gaps: 0 (tap)

No gap recorded for this panel.